Screen Shot 2018 07 23 at 09.00.41

Electrical Division Complete Work To AVIS

Posted June 18th, 2018 in All Posts, Electrical Division
2Teck’s electrical division have completed another installation for Avis, one of the UK’s largest car hire companies. The newly installed underground pumps which remove waste water from the car wash facility required a dedicated 125 amp 3 phase supply. The existing underground duct work was damaged so our engineers installed an armoured electrical cable from the local distribution via a new trench to the Avis premises. All issues were resolved quickly to ensure this project was completed within tight timescales.