Fast Track Vehicle Leasing – Air Conditioning and Data Design & Installation

2Teck Air Conditioning were tasked with a full air conditioning and ventilation design and installation for Fast Track Vehicle Leasing’s recent office refurbishment. Our proposal was to install a Mitsubishi Electric Heat Recovery VRF system, integrated alongside Mitsubishi Electric heat recovery ventilation units.
Meanwhile, 2Teck’s Communication division have installed a complete Excel Cat6 network cabling infrastructure into the new offices which will support all of the data, voice and CCTV connectivity. All of the cabling has been run back to a new secure network cabinet with integrated power distribution and fully Fluke tested on completion. Access to certain areas of the building are controlled with a Paxton Switch2 access control system and security has been further enhanced with a Dahua CCTV system with internal and external cameras and images being recorded 24/7. In this video we showcase the finished project.