![Screenshot 2022 05 25 at 14.17.26](https://www.2teck.co.uk/wp-content/uploads/2018/11/Screenshot-2022-05-25-at-14.17.26-1100x601.jpg)
Pure Offices Phase 1
2Teck have recently been assigned to carry out the mechanical and electrical design and installation at Pure Offices in Port Solent, Portsmouth. These works will see a large open plan office area converted into 28 small rentable spaces. As part of the project, 2Teck will include the supply and installation of a Daikin Heat Recovery VRV system, modifications to existing ventilation ductwork, installation of LED lighting and small power throughout as well as high speed fibre optic data links and a Cat6 structured network cabling system distributed from a new comms room facility.