Included in 2Teck’s Plumbing & Heating’s design was the installation of a gas-fired condensing boiler that served an Underfloor Heating System, towel rail circuit and unvented hot water cylinder, whilst the hot water system included a hot water return circuit to ensure instant hot water at all outlets. 2Teck’s gas safe registered engineers carried out the full installation to industry standards and commissioned all mechanical plant to deliver maximum efficiency.
© 2024 2Teck All rights reserved. | Registration number: 04834894 | Privacy Policy
Website by Eldo™