Portable Centres

As part of the combined M&E fit out solution within the new Portable Centres offices, 2Teck’s Communication Division designed, supplied and installed a new high speed Cat6 structured cabling solution to support the various IT, voice, audio visual & CCTV devices. Internet connectivity was provided using twin fibre broadband connections secured using a Cisco Meraki security appliance with network distribution provided with 1Gb POE network switches. New, large format high definition LED display screens have been installed into the meeting room and a new high specification Epson laser printer and HP A1 plotter now provide an efficient printing solution with low ongoing costs. The existing Paxton Net2 access control system and intruder alarm were modified to to provide easy, yet controlled access during the day whilst providing a high level of security when unoccupied and the fire alarm system was extended due to the change in life safety requirements caused by building construction changes.

2Teck Air Conditioning were asked to design and install an energy efficient heating, cooling and ventilation system for our valued customer Portable Centres. This required numerous design meetings to meet the customers vision and resulted in us supplying and installing a Daikin heat recovery VRV system consisting of a mixture of ceiling concealed ducted fan coils, complete with all required ductwork, thermal insulation and ceiling grilles, as well as a number of 600 x 600 ceiling cassettes within the smaller partitioned office areas. In order to maintain a fresh working environment, 2Teck air conditioning also installed a number of energy efficient Daikin heat recovery ventilation units, all of which were controlled via a centralised I Touch manager controller with BMS capabilities. The final result left the customer with an extremely comfortable environment for their staff and visitors.

2Teck Electrical were tasked with the design and installation of a full power and lighting package to the new Portable Centres head office. This comprised of energy saving LED lighting throughout with bespoke feature pieces to key areas of the office space controlled via a variety of occupancy sensor, dimming and local switching methods. Power was provided to all areas via a new metered dedicated distribution board servicing the area with all final fixtures and fittings of high end industry leading manufacturers. As per 2Teck standard all cabling was installed upon individual service dedicated galvanised metal tray work and baskets from source to final positions throughout. Commissioning and NICEIC certification completed the project with a client final walkthrough and hand over of all relevant O+M literature.