Our Electrical Division installed new lighting throughout, covering a range of office style environments inclusive of the emergency lighting as well as high bay warehouse lighting. We replaced the existing mains distribution board with a new distribution board that will be fit for the requirements of the client. Small power was also installed throughout the site as well as a dedicated supply to the new comms cabinet which was all fed via a high level basket containment as well as low level three compartment dado.
© 2024 2Teck All rights reserved. | Registration number: 04834894 | Privacy Policy
Website by Eldo™