Pure Offices

Phase 1

2Teck have recently been assigned to carry out the mechanical and electrical design and installation at Pure Offices in Port Solent, Portsmouth. These works will see a large open plan office area converted into 28 small rentable spaces. As part of the project, 2Teck will include the supply and installation of a Daikin Heat Recovery VRV system, modifications to existing ventilation ductwork, installation of LED lighting and small power throughout as well as high speed fibre optic data links and a Cat6 structured network cabling system distributed from a new comms room facility.

Phase 2

Works at Pure Offices in Port Solent have been progressing at a great speed. All air conditioning services and fan coils have now been second fixed and landlords ventilation systems have been extended and altered to suit the new office layouts. 2Teck have also begun installing the new ceiling grilles, all electrical and data services have been installed and we now await the finishing trades to complete in order for us to install floor boxes and sockets, ahead of final completion and commissioning.